| 12'
wide x 9' high opening in outside wall leads to basement of university
engineering facility. |
First 7' wide
x 23' long x 8' 8" high Haz-Safe Building module being craned
from trailer to opening. |
First module
just inside opening and shoved over to farthest corner to make room
for second module. |
 |
 |
 |
| Crane
outside opening lifts second 10' wide x 23' long x 8' 8" high
module near opening. First module on left. |
Forklift picks
up some of load, while backing up, pulls second module in. |
It's a tight
squeeze for second module. Blue taped foam covers sharp objects
from cutting shrink wrap. |
 |
 |
 |
| "Cover-up"
to begin after double modules are bolted together using patented rod
within tube hardware. |
Opening is bricked,
sealing in 18' wide x 24' long Haz-Safe inplant building. Scaffolding
is for bricking of chimney. |
Brick "fake"
chimney hides Haz-Safe Building's ducts that lead to dual exhaust
fans on roof. |
 |
 |
 |
| Finished building's
fire rated doors lead to (3) rooms accessible up a 13' wide ramp with
handrails. |
Rooms separated
with chain link walls. Baked-on porcelain enamel steel finish over
fire rated gypsum on exterior walls. |
Room as utilized
by Engineering Department is protected with Inergen and sprinkler
fire suppression systems. |